How Many Bags of Concrete for a 18 Inch Sonotube?
A 18" tube filled 48" deep needs 13 bags of 80 lb concrete.
13bags
80 lb bags · estimated $90.74 at $6.98/bag
Advertisement placeholder (ad-slot-1)
Estimated cost: ~$90.74 (13 × $6.98/bag, Spring 2026 pricing)
Bag size
Multi-bag comparison
| Bag size | Bags | Price/bag | Total |
|---|---|---|---|
| 80 lbBest value | 13 | $6.98 | $90.74 |
| 60 lb | 18 | $5.98 | $107.64 |
| 40 lb | 26 | $4.98 | $129.48 |
Prices are spring 2026 estimates. Above ~60 bags, price a ready-mix truck too — it is often cheaper.
Material list
- 13 × 80 lb concrete mix bags — $90.74 @ $6.98/bag (Spring 2026)Home Depot ↗Lowe's ↗
- Wheelbarrow or mixing tub
- Mixing hoe or drill paddle
- Margin trowel or float
Advertisement placeholder (ad-slot-2)
13 bags(80 lb)
$90.74
How this is calculated
We convert your dimensions to cubic feet, add a 10% waste buffer for spillage and an uneven subgrade, then divide by the bag's yield and round up to the next full bag.
FAQ
How many bags of concrete for a 18 inch sonotube?
A 18-inch tube filled 48 inches deep needs about 13 bags of 80 lb or 18 bags of 60 lb concrete, including 10% waste.
How do I calculate concrete for a deeper or shallower tube?
Enter your depth in the calculator above and the bag count updates instantly. Concrete scales directly with depth.
How much concrete does a 18 inch sonotube hold?
About 7.1 cubic feet per 48 inches of depth for a 18-inch tube.
Related pages
← Back to Sonotube Concrete Calculator
- How Many Bags of Concrete for a 6 Inch Sonotube?
- How Many Bags of Concrete for a 8 Inch Sonotube?
- How Many Bags of Concrete for a 10 Inch Sonotube?
- How Many Bags of Concrete for a 12 Inch Sonotube?
- How Many Bags of Concrete for a 14 Inch Sonotube?
- How Many Bags of Concrete for a 16 Inch Sonotube?
- How Many Bags of Concrete for a 24 Inch Sonotube?